PROJECTS IN STP OF ATHENS IN PSYTTALIA

PROJECT EMPLOYER DESCRIPTION YEAR
17 FIRE PROTECTION PIPE LINES AT THE DRY SLUDGE STORAGE AKTOR SA – ATHENA SA CONSTRUCTION OF PIPILINES   GS DN 2″ – 4″ 2011
16 EXTENSION OF THE EXISTING SYSTEM OF DISINFECTED INDUSTRIAL WATER JOINT VENTURE: AKTOR SA – ATHENA SA – N. & K. GKOLIOPOULOS SA CONSTRUCTION OF PIPILINES   CS DN 250 2009
15 NEW MECHANIC FILTERS OF INDUSTRIAL WATER ROOM JOINT VENTURE: AKTOR SA – ATHENA SA – N. & K. GKOLIOPOULOS SA CONSTRUCTION OF PIPILINES   CS DN 250 2009
14 BIOGAS BURNING STATION ATHENA SA – AKTOR SA CONSTRUCTION OF PIPING NETWORK    CS  KAI SS DN 250 – DN 400 2008
13 GRP COVERS ATHENA SA – AKTOR SA INSTALLATION  OF  GRP  COVERS  OVER  INFLUENT  CHANEL 2008
12 A. NEW SLUDGE HOLDING PUMP STATION AND PIPE LINES & B. NEW DRAINAGE WATER PIPE LINES ATHENA SA – AKTOR SA CONSTRUCTION OF PIPING NETWORK    SS DN 250 2007
11 MECHANICAL INSTALLATIONS IN DEWATERING – PHASE B’ ATHENA SA – AKTOR SA CONSTRUCTION OF PIPELINES PVC Φ90 AND SS DN150 – DN 200 2007
10 CONNECTIONS OF INDUSTRIAL AND POTABLE WATER NETWORKS NEAR THE DEWATERING TUNNEL AKTOR SA – ATHENA SA CONSTRUCTION OF PIPING NETWORK (HDPE DN 250) 2007
9 CONSTRUCTION OF AIR AND DRAINAGE WATER PIPING AKTOR SA – ATHENA SA SS DN 600 – 900 AND SS DN 2″ 2007
8 CONSTRUCTION AND INSTALLATION OF AIR DUCT PIPES AKTOR SA – ATHENA SA SS DN 1250  PIPING 2006
7 GRID CHAMBER RECONSTRUCTION AKTOR SA – THEMELIODOMI SA -ATHENA SA CONSTRUCTION OF PIPILINES  GS  DN 250 2005 – 2006
6 EQUIPMENT INSTALLATION AND FLOCCULANT DOSING SYSTEMS IN SLUDGE FATTENING AND DEWATERING AREAS THEMELIODOMI SA – AKTOR SA – ATHENA SA – PASSAVANT ROEDIGER PRODUCTS GmbH – GIOVANNI PUTIGNANO & FIGLI s.R.I. CONSTRUCTION OF PIPILINES    SS  1/2″ – SS  4″  AND  PVC Φ 50 2004
5 INDUSTRIAL AND POTABLE WATER PIPING AND DISTRICT HEATING AKTOR SA – THEMELIODOMI SA -ATHENA SA POTABLE WATER  AND  TELEHEATING  PIPING                  (CS 4″  AND HDPE  Φ 63 – Φ 630) 2004
4 IN-THE-GROUND PIPE LINES FROM HDPE 3rd GENERATION THEMELIODOMI SA – AKTOR SA – ATHENA SA – PASSAVANT ROEDIGER PRODUCTS GmbH – GIOVANNI PUTIGNANO & FIGLI s.R.I. IN GROUND  PIPING ( Φ63 – Φ630 HDPE ) 2003
3 SCUM PUMP STATION THEMELIODOMI SA – AKTOR SA – ATHENA SA – PASSAVANT ROEDIGER PRODUCTS GmbH – GIOVANNI PUTIGNANO & FIGLI s.R.I. CONSTRUCTION OF PIPILINES  SS DN 100 2003
2 INSTALLATION OF SCUM COLLECTORS IN FINAL SEDIMENTATION TANKS THEMELIODOMI SA – AKTOR SA – ATHENA SA – PASSAVANT ROEDIGER PRODUCTS GmbH – GIOVANNI PUTIGNANO & FIGLI s.R.I. INSTALLATION  OF  SCUM  COLLECTORS    (SS DN 250) 2003
1 CLEAN WATER PIPES INSTALLATION OF FINAL SEDIMENTATION TANKS THEMELIODOMI SA – AKTOR SA – ATHENA SA – PASSAVANT ROEDIGER PRODUCTS GmbH – GIOVANNI PUTIGNANO & FIGLI s.R.I. CONSTRUCTION OF PIPILINES  SS  DN 250 2003